{"batchcomplete":"","continue":{"lecontinue":"20260928220209|217","continue":"-||"},"query":{"logevents":[{"logid":227,"ns":0,"title":"Winter projecten","pageid":0,"logpage":124,"revid":366,"params":{"target_ns":3000,"target_title":"Private:Winter projecten","suppressredirect":""},"type":"move","action":"move","user":"Quintenlb","timestamp":"2026-10-20T18:18:00Z","comment":""},{"logid":226,"ns":0,"title":"Winter projecten","pageid":0,"logpage":124,"revid":365,"params":{},"type":"create","action":"create","user":"Quintenlb","timestamp":"2026-10-20T18:15:47Z","comment":"Yay first commit"},{"logid":225,"ns":0,"title":"First foiling day (17 October 2026)","pageid":123,"logpage":123,"revid":362,"params":{},"type":"create","action":"create","user":"Aran Dokoupil","timestamp":"2026-10-06T17:02:43Z","comment":"Created page with \"The '''first foiling day''' is the hydrofoil's first time on the water under [[Autopilot|autopilot]] control, planned for '''17 October 2026'''. This page is the plan for the day: what to check at the dock, the four stages on the water in order, when to stop, and what to read in the logs between runs. Read the [[Foiling information for pilots|pilot guide]] first; this page assumes the driver knows the status light.  The goal of the day is modest on purpose: check that th...\""},{"logid":224,"ns":2,"title":"User:Dedier","pageid":0,"logpage":0,"params":{"oldgroups":[],"newgroups":["bot","bureaucrat","interface-admin","suppress","sysop"],"oldmetadata":[],"newmetadata":[{"group":"bot","expiry":"infinity"},{"group":"bureaucrat","expiry":"infinity"},{"group":"interface-admin","expiry":"infinity"},{"group":"suppress","expiry":"infinity"},{"group":"sysop","expiry":"infinity"}]},"type":"rights","action":"rights","user":"Mediawiki","timestamp":"2026-10-01T07:42:26Z","comment":""},{"logid":223,"ns":2,"title":"User:Dedier","pageid":0,"logpage":0,"params":{"userid":12},"type":"newusers","action":"create2","user":"Mediawiki","timestamp":"2026-10-01T07:39:24Z","comment":""},{"logid":222,"ns":2,"title":"User:Possible Sponsors","pageid":122,"logpage":119,"revid":358,"params":{"target_ns":3000,"target_title":"Private:Possible Sponsors"},"type":"move","action":"move","user":"Quintenlb","timestamp":"2026-09-30T18:48:13Z","comment":""},{"logid":221,"ns":0,"title":"Possible Sponsors","pageid":121,"logpage":119,"revid":356,"params":{"target_ns":2,"target_title":"User:Possible Sponsors"},"type":"move","action":"move","user":"Quintenlb","timestamp":"2026-09-30T18:47:30Z","comment":""},{"logid":220,"ns":0,"title":"Possible Sponsors","pageid":121,"logpage":119,"params":{"count":{"revisions":2,"files":0}},"type":"delete","action":"restore","user":"Quintenlb","timestamp":"2026-09-30T18:42:05Z","comment":"Public suppressing added"},{"logid":219,"ns":0,"title":"Solar Array","pageid":120,"logpage":120,"revid":355,"params":{},"type":"create","action":"create","user":"Aran Dokoupil","timestamp":"2026-09-29T09:46:09Z","comment":"Created page with \"''This page describes the solar array under development for the 2027 season. The design is preliminary and details may change as supplier discussions and testing progress.''  == Overview == For the 2027 season the team is replacing its current solar deck, a set of commercial flexible panels with 272 back-contact cells, with a custom-built array. The new deck is designed around three goals:  * '''Maximum power per unit area''', using roughly 6 m\u00b2 of cell area to make ful...\""},{"logid":218,"ns":0,"title":"Possible Sponsors","pageid":121,"logpage":119,"params":{},"type":"delete","action":"delete","user":"Quintenlb","timestamp":"2026-09-29T06:51:24Z","comment":"content was: \"Hier wordt aan gewerk\", and the only contributor was \"[[Special:Contributions/Aran Dokoupil|Aran Dokoupil]]\" ([[User talk:Aran Dokoupil|talk]])"}]}}